Jason

9/6/2014
St. Louis, MO

Position Desired

Manufacturing Engineering
Anywhere in the U.S.
Yes

Resume

OBJECTIVE:

To secure a challenging Automation, Electrical, Mechanical or closely related Project Management, Engineering, Facility or Maintenance position.

EDUCATION:

WASHINGTON UNIVERSITY – St. Louis, MO
Bachelor of Science in Electrical Engineering (BSEE, 1994)

EMPLOYMENT EXPERIENCE:

MCM MANAGEMENT CORPORATION – Bloomfield, MI March/2011 – Jan/2012

Complex Site Manager / Project Manager / Consultant for Chrysler Demolition Process
- Consulted and estimated on Chrysler Complex metals and debris during demolition process.
- Developed scopes of work and directed local mechanical/electrical contractors on utility disconnects for demo permits.
- Prepared and obtained demolition permits from St. Louis County Building Group.
- Created daily reports for project site for MCM corporate office reviews.
- Managed site operators and laborers – Planned manpower and project work schedules.
- Managed the MCM Rigging Company on removal of Chrysler purchased Paintshop equipment for corporate reuse – substations, oven heater boxes and automation.
- Developed / Managed / Performed Safety Reviews and Talks – Tool Box Talks.
- Analyzed / Estimated / Classified / Sorted various metals through demolition process using Niton Metal Analyzer.
- Operated SAI System for scales for MCM Management Corporation deliverables.
- Managed site mechanic and parts for all various types of CAT and LaBounty equipment.
- Maintained equipment list for service, hours and relocation shipments.
- Managed and coordinated debris processing/hauling, load estimates and landfill account funding.
- Managed and coordinated metal processing, loading and hauling.
- Managed Complex Site Security – Daily reviews and manpower for 3 shifts of coverage.
- Completed / Closed out demolition permits for final site review and transition to Capstone AG.

CAPSTONE ADVISORY GROUP, LLC – Chicago, IL May/2010 – March/2011

Complex / Facility Site Manager and Consultant - Chrysler St. Louis North and South Plants
- Directed / Oversaw entire Chrysler Complex – 295 acres / 5 Million Sq. Ft. for Chrysler North, South, Power House and Waste Water Treatment Plants (WWTP).
- Consulted with Advisory & Reality Groups on restructuring/redevelopment planning and site tours.
- Managed local contractors on facility maintenance and repairs (Electrical / Mechanical).
- Developed Facility Complex Winterization Plan for South / North / WWTP – Repaired and maintained air supply house (ASH), burners and commercial lift door heaters.
- Managed and coordinated Chrysler Asset Recovery Commercial Auction and equipment removal.
- Managed 3 shifts of security manpower and systems for Complex.

CHRYSLER GROUP LLC – Fenton, MO Feb/1995 – May/2010
St. Louis North and South Assembly Plants

Plant and Facility Manager Sept/2009 – May/2010
- Directed / Oversaw Chrysler Corporation Asset Recovery and Complex Decommissioning for all Departments including Body Shop, Paintshop, Trim, Chassis, Final Areas and Material.
- Decommissioned Chrysler North, South, Powerhouse and Waste Water Treatment Plants.
- Finalized last day with Chrysler Group LLC (Chrysler / FIAT) and Capstone AG transition.
- Managed the removal and shipping of 1,100+ Robots / Pallet Systems – Entire DS Body Shop.
- Developed Corporate Charge Work Orders for asset recovery for all Chrysler North plant equipment by estimating manpower, time, materials and shipping to remove equipment.
- Managed all salary and hourly employees through the Corporate Decommissioning Process.

Senior Paint Automation Specialist – Launch Support July/2009 – Sept/2009
- Supported Chrysler Group, LLC – Buildout / Launch Support at Jefferson North Assembly Plant, MI – Cherokee and Commander Buildout.
- Assisted in upgrades for new Jeep Cherokee launch / Preprogramming on new Dodge Durango.
- Implemented new World Class Manufacturing (WCM) Lean Techniques from FIAT System.

Lead Area Manager of Maintenance – Paint Department March/2008 – July/2009
- Planned, managed and directed St. Louis Assembly North Paint Department for Electrocoat / Phosphate / Powder / Paint for Chrysler Operation System (COS).
- Managed Paintshop - Engineering / Maintenance / Planning / Model Changes / Manpower.
- Coordinated and trained on newly implemented Lean FIAT in World Class Manufacturing Processes.
- Managed the Paint Department through the idle status and shutdown of all processes.

Senior Paint Engineering / Automation Specialist Jan/2000 – March /2008
- Managed 3rd Shift – Maintenance / Startup / Deep Cleaning / PM-TMS and TPM.
- Managed the Maincolor Booth 1 & 2 / TuTone – Process / Maintenance / Cleaning.
- Led the Maincolor Booth 1 & 2 / TuTone – Programming on DR and DS RAM Truck models.
- Directed Skilled Trades in the maintenance for automation systems (ABB Robotics and DURR/BEHR bell applicators), spraybooths, conveyors, drives, take-ups, ovens and lights.

Paint Automation Specialist / Paint Engineering Planner Sept/1998 – Jan/2000
- Oversaw for Chrysler the construction, startup and launch of the 1999 New Maincolor 2 Spraybooth System and Ovens for the St. Louis North Paintshop – DR Model RAM Truck.
- Planned and scheduled weekly manpower requirements and materials for Paint Process Equipment maintenance and repairs.
- Planned Model Change schedules, materials and manpower requirements.
- Directed Model Change skilled crews for engineering, maintenance & deep cleaning processes.
- Coordinated with Chrysler Corporate Advance Manufacturing Engineers for engineering changes and local contractors’ work projects for Model Changes.

Best In Class (B.I.C.) / Automation Facilitator Feb/1995 – Sept/1998
- Launched 1st Shift Production and Process of the Maincolor Booth for the BR RAM Truck. Managed Contractors ABB and SAMES / EXEL on Maincolor automation programming pathwork.
- Launched 2nd Shift Production and Paint Process of Maincolor and Tutone Booths.
- Managed Skilled Trades in the Maincolor Booth and TuTone – Process / Quality / Maintenance.
- Supervised and trained Maincolor Booth and Tutone – Sprayers and Automation Tech Operators.
- Developed and maintained PM / TMS / TPM systems for Paintshop equipment.
- Maintained film build process and automation pathwork for Paint quality and process.

MCDONNELL DOUGLAS AEROSPACE CORPORATION – St. Louis, MO Dec/1994 – Feb/1995

Engineer – Avionics Integration
- Avionics Hardware Support Engineering Department – Avionics Integration.
- VECTR (Vertical / Short Takeoff and Landing Enhanced Control Technology Research) Program for the TAV8B – Harrier II Aircraft (T1).
- Worked on Research & Design Team to develop triplex digital design for fly-by-wire and fly-by-light flight control computers and air data sensors.

ALBERT ARNO HEATING & COOLING, INC – St. L...

Login or Register to view the full resume.