Alex

5/13/2015
Red Bank, NJ

Position Desired

Structural Engineering
Anywhere in NJ; Anywhere in NY
Yes

Resume

Alex Resume

Education:

Masters of Structural Engineering, University of Delaware, Newark, DE June 2013 GPA: 3.17/4.0

Bachelor of Civil Engineering, University of Delaware, Newark, DE June 2012 GPA: 3.5/4.0 – Dean’s List: Spring 2009 to Spring 2012

Professional Certifications
EIT certified
New Jersey Society of Professional Engineers, Monmouth Chapter - Secretary SPRAT level 1 rope access certified
SWAC, Port Authority, and Merck security clearance

Skills
AutoCAD Civil, Microstation, Staad, Enercalc, and Microsoft Office (Word, Excel, and PowerPoint) proficiency

Work Experience:
T&M Associates Middletown, NJ 09-16-13 – Present
• Staff Designer Key Projects:

Park Avenue Handicap Ramp Reconstruction, Rutherford, NJ.
• Drafted CAD files and completed site inspections of sidewalk handicap ramps to be replaced.
Four Seasons at Great Notch, K. Hovnanian, West Paterson, NJ.
• Performed AutoCAD revisions, worked on budgets and revised technical documents
Harold Walls Field Improvements, Rutherford, NJ.
• Assisted the Borough Engineer on site design, drafting of AutoCAD files and construction overview.
NJEIT Phase II Improvements, Flood Control, Dumont, NJ.
• Observed and monitored the installation of walls to help keep a culvert open to alleviate flooding.
Sewaren Marina Site Design, Woodbridge Township, NJ.
• Provided design assistance for the development of contract documents for site improvements at the marina. Scope included a parking lot, restroom building, site lighting and relocation of electrical panel. Utilized Enercalc and AutoCAD to draft designs.
Ballistic Barrier Knee Wall Replacement at Fire Academy, Monmouth County, Howell, NJ.
• Provided design assistance for the replacement of a knee wall ballistic barrier. Environmental testing for lead contamination was also performed. Responsibilities included assistance with the budget, specifications and attendance at pre-construction meetings.
Beach Access Ramp and Public Restroom, Sea Bright Borough, NJ.
• This project consisted of the design and construction of a new ADA compliant access ramp from the Anchorage Lot over the seawall to the beach and access to a public restroom. My responsibilities included assistance with bulkhead and parking lot construction quantities and specifications.
Mechanical Mezzanine Addition, Merck, Rahway, NJ.
• Provided design assistance for a project involving a raised mechanical steel platform allowing access to existing mechanical equipment at the Merck Rahway site.
Parking Garage Structural Inspection, Merck, Kenilworth, NJ.

• Assisted a PE with the inspection of a below grade parking deck at building K11 at the Merck Kenilworth site. I provided an evaluation of cracking and efflorescence on the underside of the overhead deck and I compiled a report of the findings.
Summit Utility Tunnel Inspections Buildings 1, 2, 3 and 4, Merck, Summit, NJ.
• Performed utility tunnel inspections of 5 tunnels at the Merck Summit Facility and provided a report of the findings.
ADA Ramp Compliance Review - Central Region, New Jersey Department of Transportation.
• I was a member of the engineering team to provide field investigation and report preparation associated with ADA compliance evaluations for Central Region projects for the NJDOT. Extensive use of the 2010 ADA regulations, July 2011 PROWAG, and the NJDOT Guidance for ADA Project Evaluation & Inventory were required. Project deliverables included detailed analyses of all non- compliant ADA elements, as well as a summary table for each project that identified the number of non-compliant ramps and pedestrian pushbuttons (at traffic signals).
Bridge and Culvert Inspections, Bergen County Department of Parks.
• Project involving the inspection, rating and report preparation of 62 bridges, under-crossings and culverts for the Parks Department. I assisted with final inspection reports utilizing Microstation.
Condition Survey of JFK Building 156 and Control Tower Facades, PANYNJ, Queens, NY.
• Assisted with structural inspections at the JFK International Airport. Work included visual and hands- on inspections of the Japan Air Cargo building 156 and the Control Tower. Rope climbing techniques were utilized to rappel down the control tower due to standard lift equipment and scaffolding being unsuitable; bucket trucks and binoculars were also used. Assisted with reports and AutoCAD...

Login or Register to view the full resume.