Dhanasekar

2/3/2015
Roanoke, VA

Position Desired

Project Engineering
Anywhere in the U.S.
Yes

Resume

Summary:

Authorized to work in United States with any employer.

Domain Experience:

Power Plant Automation (Turbine/Boiler Controls)
Coal Yard Automation
Water Treatment Plant
Oil Extraction and Transportation

PLC/DCS Experience:

Elsag Bailey DCS – INFI90
Honeywell DCS – C200 Controller
GE Mark VIe, Mark VI Controller
GE Cimplicity (HMI)
Easy 5 Simulation software (Boeing)
Allen Bradley PLC
Seimens PLC

Strengths:

Self-Motivated
Proactive & Quick learner in adopting to new systems
Quality in solutions
Individuality, Enthusiasm and dedication in assignments
Good Team Player
Excellent Communication Skills
Innovative

Employment Summary:

GE Energy, Salem, VA from August 2012 till date with designation as “Lead Engineer”

GE Energy, Hyderabad, from May 2004 to May 2007 with designation as “Lead Engineer”

Tata Honeywell, Chennai, from Oct 2003 to May 2004 with designation as “Application Engineer”

TCP Power Division, Gummidipoondi from July 1999 to Sep 2003 with designation as “Engineer”

Graduation & High School:

MBA in Management (2007 – 2009)
Strayer University, King of Prussia, PA (Grade: 3.8)

Graduate 4 year degree
Instrumentation and Control engineering (1994-1998),
Regional Engineering College (NIT), Trichy, India (first class, 62%)

Higher Secondary (12’th Grade)
SpicNagar Higher Secondary School, Tuticorin, India (94%)

Secondary School Final(10th Grade)
SpicNagar Higher Secondary School, Tuticorin, India (88%)


Achievements:

Performer in providing solutions to develop any complex control loops.

Performance rated as ‘High Value’ by GE Energy.



Projects:


1. Steam Turbine Controls:
May. 04 –May 07
Company - GE Energy

Controller - Mark VI

HMI - Cimpliciy V5.5

Number of Projects - 22 Steam Turbine Units

Frame Sizes - Large Steam Turbine, Medium Steam Turbine
Straight Condensing

a, Preparation of the I/O report based on customer specification and the process drawings.
b, Ordering hardware and the HMI based on the specification and the hardware requirements.
c, Configuring software for the given specification and I/Os
d, Configuring screens based on the software and populating the signals on the HMI.
e, Integrating the software and HMI for multiple units
f, Simulating the software using Easy 5 simulation software by loading the machine up to full load.
g, Packaging the complete software and HMI for all units and shipping to site.


2. Gas Turbine Controls:
May. 04 – May 07
Company - GE Energy

Controller - Mark VI

HMI -Cimplicity V5.5

Number of Projects - 13 Gas Turbine Units

Frame Sizes - GE Frames 9FA, 7FA, 6B, 9E

a, Preparation of the I/O report based on customer specification and the process drawings.
b, Ordering hardware and the HMI based on the specification and the hardware requirements.
c, Configuring software for the given specification and I/Os
d, Configuring screens based on the software and populating the signals on the HMI.
e, Integrating the software and HMI for multiple units
f, Simulating the software using Easy 5 simulation software by loading the machine up to full load.
g, Packaging the complete software and HMI for all units and shipping to site.


3. Oil Extraction & Transportation:
Nov. 03 –May. 04
Company - Tata Honeywell

Controller - Experion C200

Customer - BP, Amenas

Role - Module Lead

Team Size - 5

a. Configuration of Monitoring loops, simple Control loops, complex Control loops and Sequence Controls.
b. Preparation of Graphic sketches by freezing P&IDs.
c. Implementation of Graphics and hook up with controller points.
d. Preparation of Master Engineering Database in Microsoft Access.
e. IO channel assignment, taking care of input ...

Login or Register to view the full resume.