Ready to Go

2/17/2015
Philadelphia, PA

Position Desired

Construction Engineering
Anywhere in the U.S.
Yes

Resume

Objective:

I am looking for a position as a Project Manager or Assistant Project Manager. I am also looking to be hired by a company with experienced managers who can mentor me for a senior management position in the future. I am dedicated and hard working individual knowing that the success of my employer is equal to my success.

Employment:

Mount Construction Company
Project Engineer 01-2010 to 04-2011
Description: Write scope of work for subcontractors, write purchase orders, order materials, submittals, RFI's, write schedule and update job schedule. Coordinate work with superintendents., review billing, job cost reports, billings projections, write change orders and other duties.

Philadelphia Housing Authority
Facilities Engineer 01-2009 to 08-2009
Description:  Review residents maintenance request.  Check the validity of their request and find the clear problem.  Create a service order and assign it to a maintenance worker.  Order and receive materials.  Perform preventative maintenance inspections.  Review completed maintenance work.
 
Joseph Jingoli & Son Contractors and Construction Managers:
Project Engineer 05-2004 to 06-2007
Description: Assist project managers with estimating, request for proposal writing and review, manage subcontractors for Wetlands fill and surcharge operations, Pile cap installation., Retention Wall installation, temporary parking lot construction, Deep Utility installation and rerouting on private and NJ State Roads. Process shop drawing, RFI’s and Submittals. Reviewed monthly requisitions, Writing of change orders and various other duties.

Oldcastle Precast Modular Group:
Project Manager 11-2002 to 09-2003
Description: Review proposals for necessary scheduling, manpower and resources. Assigns and coordinates project personnel. Maintains and revises schedule and manpower to ensure the successful Project completion.

Dick Corporation
Project Engineer-Civil 07-01 to 10-02
Description: Managed all RFI and Submittal Documentation, Assisted on Concrete, Earthwork and Underground Piping Contracts. Organized and Sent out RFP’s for Masonry, Painting (Structural Steel) and Materials Testing. Managed the Field Fabricated Tank Subcontractor. Procured materials and performed various other management duties.

Whiting-Turner Contracting Co.
Project Engineer 05-00 to 10-00
Description: Estimating, Scheduling, Purchasing, processing RFI, Inspecting, Oversaw Painting Contractor, Project Turnover Packages, Purchase Orders and other administrative duties.

Technical Experience:
Computer: Primavera Expedition, BAR7.8, Borland C++, Job Center, AutoCAD, MS Excel, Lindo, MathCAD, MS Word, MS PowerPoint, SureTRAK, Agtek, Oracle CRM, Lotus Notes, HCSS

Specifications: 2001 & 2007 NJDOT Spec, AASHTO Bridge Design, ACI, ASCI, BOCA, LFRD

Education:
University of Pittsburgh, Pittsburgh PA
Bachelor of Science in Civil Engineering, Graduated April 2000
Central High of Philadelphia, Graduated June 1995

Specialized Courses:
Civil Engineering Courses: Estimating, Concrete Structures 2, Steel Structures 2, Prestressed Concrete, Foundation Engineering, Concrete Structures, Steel Structures








Projects List
Mount Construction Route 22 over Burke Parkway, 01-10 to 04-11
Bridge Rehabilitation on Rt 22 just before Garden State Parkway in Union NJ. Project included Value Engineering from a Precast deck to a Cast in Place deck in 3 stages. The work is being completed on an accelerated schedule of 5 months. The total Project cost for VE is Below 1.24 Million Dollars. The Scope of work included Demolition of existing Bridge deck, Cleaning and Painting of Existing Beams. Installation of new Bridge deck Roadway drainage upgrade, new guide rail installation and sidewalks and curbs.
Mount Construction Main St over Rt 206, 01-10 to 12-10
Bridge Rehabilitation on CR543 over US206 in Mansfield NJ. Project included 2 stages bridge re-decking , unforeseen lead abatement on the Girders, Drainage upgrade on the approaches, and spall repairs on the abutments. Total project cost 1.35 million dollars.
Philadelphia Housing Authority 01-09 to 08-09
Login or Register to view the full resume.