Education:
University of Nevada Reno, Reno NV 08/2008 - 12/2011
Bachelor of Science: Geological Engineering (ABET certified)
Minor: Hydrogeology
GPA: 3.4 – Graduated (133 semester hours)

Fayetteville Technical Community College, Fayetteville NC 06/1992 – 04/1994
Associates Degree
GPA: 4.0 - Graduated (106 quarter hours)

Honors:
• Tau Beta Pi (The Engineering Honor Society)

Military:
Seven years active duty Army.
• Honorable Discharge – Sergeant

U.S. Passport:
• Number: 493180110 Expires: 04/10/2022

Driver License:
• State: NV Number: 0003371174 Expires: 09/06/2016

License:
• Florida Real Estate Sales License: SL3171119 (expired)
• Life, Health & Variable Annuity License: P115676 (inactive)
• Washington General Contractor License: CC SDVOCCI887JS (inactive)

Relevant Coarse Work:
Strengths of Materials, Fluid Mechanics, Soil Mechanics, Rock Mechanics, Earthquake Engineering, Mining Engineering, Engineering Slope Stability, Applied Hydrogeology,Mineralogy / Geochemistry, Sedimentology, Structural Geology, Environmental Geology, Urban Geology, Engineering Data Analysis, Spatial Data Analysis, Waste Containment.

Summary of Experience:
• 14 Years Management
• 6 Years Project Management
• 3 Years Project Engineer

Programs Used:
•RocLab •Seep/W •Slide •Office Suite •Aqtesolve
•RocFall •Dips •Excel •Visio •Wedge
•RocData •GIS •PowerPoint •ACAD (2D) •Slope/W

Work Experience:
ASI Constructors 09/04/2012 – Present
1850 E. Platteville Blvd., Pueblo West, CO 81007
**Do Not Contact Employer Until Offer is Made**

Lead Project Engineer
Fort Peck Spillway Plunge Pool Rehabilitation, McCone County, MT
Client: USACE, Omaha District, Contract Value: $32.9 M Approximately 800,000 cubic yards of excavation, placement of 95,000 cubic yards RCC(roller compacted concrete), placement of 10,000 cubic yards of CC (conventional concrete), and placement of 600 cubic yards of rip rap; also, a dewatering system, a cofferdam, spillway repairs, 201 post-tensioned and 919 un-tensioned anchors, training walls and downstream apron will be installed.
• Supervisor of two project engineers. Onsite supervisor while Project Manager is offsite.
• Prepared SWPPP, NOI, EPP, Waste Management Plan, Traffic Control Plan,
Dewatering Plan, Anchor Installation Plan, Access and Haul Road Plan,
Excavation Plan, Foundation Preparation Plan, Concrete Production Plan,
Formwork Plan, and Dewatering Plan.
• Obtained permits for: dewatering wells, water discharge, water usage.
• Negotiated and wrote sub-contracts for $15.3 M of work.
• Review authority for all sub-contracts, change orders, and purchasing orders.
• Performed onsite quality control checks and worked closely with construction
superintendent to insure plans were implemented.
• Prepared RFI’s and Serial Letters for contract drawings, specifications, and
constructability issues.
• Assisted in schedule preparation and prepared monthly schedule CPM update
using P6 for payment applications.
• Primary point of contact for all USACE engineering correspondence.

Project Engineer
Canton Lake Dam Weir and Hydraulic Structures, Blaine County, OK
Client: USACE, Tulsa District, Contract Value: $37.2 M
Approximately 150,000 cubic yards of excavation, placement of 40,000 cubic yards of CC (conventional concrete), installation of a structural steel temporary shoring system to engage the existing diaphragm walls, 80 steel pilings 24” in diameter, 75 cable tie-backs; as well as, installation of an upstream apron, downstream apron, intake monolith, intake conduit, weir, and 9 fuse gates 30 feet tall and 50 feet wide.
• Project Engineer for project start-up and initial planning.
• Prepared Dewatering / Trenching Plan, Excavation Plan, Apron Drain Plan,
Foundation Preparation Plan, and Concrete Production Plan.
• Researched products and product data to ascertain applicability and job cost
benefit analysis within defined scopes of activities and in conformance with
project specifications.
• Worked with sub-contractors directly and indirectly to: generate bids for scopes
of work, identify strengths and weaknesses of the companies’ abilities to perform,
generate sub-contracts, built relationships and paths of communication to
accomplish assigned tasks.
• Point of Contact and QC/QA for dewatering well, piezometer, and inclinometer
installation, dewatering trenching and temporary shoring activities.
• Worked with QC and Safety personal to obtain required and/or necessary
information to perform all assigned tasks; specifically, AHA/JHA and field QC
documentation templates.
• Communicated and coordinated with sub-contracted engineering firm (Schnabel)
throughout the construction planning and installation of the dewatering system
and temporary shoring system.
• Generated quantity reports.
• Performed cost coding for labor activities.
• Communicated and worked both directly and indirectly with surveyors to
establish baseline reports, quantity reports, control markers, take-offs, and
detailed surveyed information when applicable.
• Communicated and worked with the field superintendents to ensure the
engineered work plans were carried out correctly.

SDVO Construction, INC. 02/11/2012 – 09/03/2012
4132 East 29th Street Suite 309, Tacoma, WA 98404
General Contractor / Owner
• Site preparation and excavation

American Equity Marketing 09/01/2003 - 06/15/2008
2170 SR434 Suite 260, Longwood, FL 32750
Insurance Agent, Mortgage Broker, Manager / Owner
• Florida Residential Real Estate Agent license.
• Florida Health, Life and Variable Annuity license.
• Florida Mortgage Broker.
• Managed five employees.
• Gathered information, prepared financial documents, sales agreements, and packages for banks and borrowers to facilitate a transaction.
• Processed loans from beginning to end working closely with banks and financing
companies to provide accurate numbers to close mortgage & real estate transactions.
• Negotiated contracts between buyers, banks, and sales associates.
• Developed Marketing strategies to obtain new business
• Developed and maintained client and vendor relations.

Southern Pool Designs 08/01/2000 - 06/01/2003
127 N. Oregon St. Sanford, FL 32771
Design Engineer / Project Manager
• Scheduled meetings with owners and designed custom gunite swimming p...