Abhi

7/22/2014
Houston, TX

Position Desired

Petroleum Engineering
Anywhere in the U.S.
Yes

Resume

EDUCATION
M.S., Petroleum/Natural Gas Engineering (Geology Minor)
Major GPA: 3.8
Texas A&M University, Kingsville
Graduation Date: Dec’11

B.Tech. Petroleum & Gas Engineering
University of Petroleum & Energy Studies, India
Graduation Date: May’08


WORK EXPERIENCE
NITO & G Resources Inc., Houston June’13 - Present
Petroleum Engineer
• Created databases for Eagleford shale wells
• Database includes Production data, Fracturing data, Casing data, Location data
• Utilized PHDwin to characterize production profiles

CHEVRON, Houston Aug’12 – May’13
Junior Drilling Engineer - Contractor
• Provide final technical assurance review of all Chevron well containment responsible party documents ahead of submission to the regulators
• Defined Scope of Work for Contracting companies to supply personnel & equipment for oil spill response services
• Built a response time model in Microsoft project to calculate typical times to drill a relief well versus times to cap and contain a blowing well
• Developed internal presentations on capping and containment activities for management and technical audiences
• Maintained a budgetary oversight for internal and external spends. Assisted in the development of annual Opex budgets for containment projects. Tracking project expenditure against “Approval For Expenditures” (AFE’s)
• Designed, developed, built, and populated a Share point document management site to act as a source of key information for the Chevron Business Units in developing their location specific capping and containment plans
• Helped identify, source, and co-ordinate Chevron resources from across the company to participate in peer reviews, audits, and technical workshops)
• Calculate the worst case discharge for wells to determine if the well can be capped in case of an incident
• Analyzed the market and wrote business justifications for the need of a new piece of equipment worth 1 million dollars
• Team player co-coordinating with reservoir engineers, facility engineers, subsea engineers, Legal, finance, project managers
• Participated in team discussions, presentations , summarizing the key points, identify future work areas and creating agendas for the forthcoming meetings
Avasthi & Associates, Inc., Kingwood Mar’12 - Aug’12
Petroleum Engineer – Independent Contractor
• Analyzed the performance of the drilling operations and identified potential loss areas to reduce nonproductive-time & trouble cost, unnecessary unsafe procedures
• Made recommendations to engineering studies to improve drilling operational performance
• Supported the client Drilling Engineering Manager for generating drilling performance reports and presentations for management
• Cost estimates and AFE preparation
• Well Trajectory planning and BHA selection
• Performed Production History Matching and Forecasting for CO2 EOR wells
• Worked on over 200 wells production data in the Permian basin to Identify potential zones for CO2 Re-injection


Reliance Industries Limited, Mumbai, India Jun’08 - Jan’10
Drilling Engineer
• Documented the ‘lessons learned while drilling’ helped in lowering the Non-productive-time (NPT) by 8 to 10 % in the future wells which saved the company 20,000 dollars per well
• Daily updated and monitored the Actual vs. Planned Cost-Depth curves to ensure all the wells on schedule and within AFE.(completed 6 well campaign)
• Monitored the real-time drilling data of multiple rig sites at the onshore data center with experienced engineers & mud loggers. Highlighting any anomalies to drilling superintendent to provide solution/closure.
• Compared the breakdown of AFE’s, Well design, Mud program, Drilling program & Completions Program for 4 deep-water wells recommending program alterations for 18 well optimum package.(Value: more efficient program, with cost savings and higher productivity wells with lower skin)
• Monitored the condition of the drilling bits during drilling, recommending replacement from operator point of view to optimize costs per section drilled and optimizing ROP cost ratio.
• Successfully completed 6 well engineering support campaigns with supervisors and drilling team.
• Participated in the morning calls with the onshore rig team to discuss the daily drilling report with the Company representative on the rig. Worked with Drilling enginee...

Login or Register to view the full resume.