appu

8/13/2014
Greenville, SC

Position Desired

Process Engineering
Anywhere in the U.S.
Yes

Resume

A career oriented Process Design engineer with 9 years of experience in process related work with extensive knowledge of preparation of Basic Engineering Packages, Detailed Engineering Packages and all other Process related deliverables. She has handled variety of projects including Refinery Applications, Soda Ash and in depth hands on experience in licensor based Sulfur Recovery Unit projects.

Open to opportunities in Project Management as well.

Areas of Excellence:
• Currently workingon FEED package for DCP / MCP plant of Maaden Client, Saudi Arabia.
• Worked on FEED package for Chlor Alkali Plant in Mt. Vernon, Indiana. This project aims to convert the existing diaphragm cell to membrane cell by increasing the plant capacity.
• Process Engineer, Maaden: Project involved preparation of FEED package to EPC bidders (for Lump Sum Turnkey bids) and estimate as a Bank Feasibility Study (BFS) to Client for use to solicit funding. Work involved with the study of Purified Phosphoric Acid plant where the process is to purify the Phosphoric Acid to MGA Quality of concentration 75%w/w H3PO4 by use of a Suitable and Selective Solvent. This work involved literature research of suitable technologies, block flow diagrams, heat and material balances, process flow diagrams, piping and instrumentation diagrams, equipment sizing, and material take-off support
• Process Engineer, Confidential Client. Wacker, P5111 Project. Developing P&IDs and relief valve calculations for Distillation Subunit.
• Process Engineer, Rockwood Pigments, Augusta, Georgia. Developed design basis, datasheets, P&IDs for the entire OSBL Unit.
• Relief valve calculations, rating, sizing and adequacy check for BP Cooper River, Purified Terepthalic Acid Plant ,ISBL 1 phase, a project by Jacobs Engineering Inc, Greenville office. The BP PTA facility Cooper River, South Carolina is undergoing their 5-year Hazop revalidation process. Ahead of this revalidation, Jacobs is working for BP by auditing and calculating their entire unit’s relief valve collection. Also assisting on the clarifications, queries from site for the Construction phase of ISBL Phase 2 project.
• Have been leading the Relief Valve study of BP Cooper River, Purified Terepthalic Acid Plant ,ISBL 2 phase in India when working for Jacobs Engineering India Pvt Limited, Mumbai.
• Worked on vendor enquiries and Technical Bid Analysis of various mechanical equipment like compressors, pumps, blowers, adsorbers for Hydrogen Generation Project of Heurtey Petrochemicals, Serbia.
• Worked on workshare project of Jacobs Engineering Greenville office for CANNONBALL-1 project by supporting in Equipment list deliverable preparation.
• Detailed engineering preparation of Chennai Petrochemical Corporation Limited for the units OHCU,SRU, DCU. Work involves preparation of FEED documents for all units.
• Detailed engineering preparation of UNDERGROUND CRUDE STORAGE project of ISPRL, Vishakapatnam.
• Detailed engineering package preparation of IOCL Mathura Refinery involving motor spirit quality upgradation using Prime G+ technology by Axens.
• Basic engineering package preparation of SRU plants of China where Jacobs Netherlands is the licensor (Comprimo Sulfur Solutions). Core member of Sulfur projects handled by CSS.
• Relocation of flare study for Relene Petrochemicals, NaviMumbai
• Detailed engineering package preparation of Soda Ash plant of Gujarat Heavy Chemicals, Veraval, Gujarat
• Workshare projects of NCP, USA involving relief valve calculations.
• Phase II preparation package for Valero, St. Charles Refinery expansion on assignment to Baton Rouge office, USA.
• Preparation of process deliverables for NCU unit of IOCL Panipat for ABB Lummus.
• Extensive HAZOP Study of IOCL Mathura, MRPL process un...

Login or Register to view the full resume.