Hossam

12/25/2014
Burke, VA

Position Desired

Construction Engineering
Anywhere in the U.S.
Yes

Resume

EXECUTIVE SUMMARY

I'm a highly motivated Project Scheduler with experience across industry sectors including Commercial, Infrastructure and Residential. I have over 3 years of experience in project planning and scheduling including in Engineering, Procurement, Construction and Management environment.

I am familiar with the development of Work Breakdown Structures and Project/Activity Codes, complex networks, constraint application, critical path analysis, baselining, Key Performance Indicator (KPI) monitoring, planning assumption reporting, Schedule Risk Analysis, Resource and Cost loading, resource levelling and the application of Earned Value Analysis (EVA).

I am a certified scheduling professional accredited by the Project Management Institute and a certified advanced user of Primavera P6 and Certified instructor of Primavera Contract Manager.

I am completing a Master of Engineering Degree in Construction Management and hold Bachelor Degree in Construction and Building Engineering.



EDUCATION

• 2011 – Progress Master of Engineering Degree in Construction Management
• 2005 to 2010 Bachelor Degree in Construction and Building Engineering




PROFESSIONAL CERTIFICATES AND TRAINING:

• July 2013 Associate in chartered institute of Arbitrators - ACIArp
• Jun 2012 Scheduling Professional “PMI-SP” certified – Project Management Institute
• May 2011 PMP Exam Preparation Course
• Nov 2010 Advanced Project Management using Primavera P6(P106A)
• Nov 2010 Resources Management using Primavera P6 (P106R)




IT SKILLS

• Oracle Primavera™ R8 and R7, P6 Web, P3 – Certified Instructor
• Oracle Contract Manager™ PCM R14 – Certified Instructor
• MS Project™ 2007+
• PMWeb™
• Astra Power project™
• VICO CONTROL™
• Acumen Fuse™
• AutoCAD™ 2000+
• Microsoft Office™ Package



EXPERIENCE SUMMARY

Jun 13 - Current Scheduler – Full Time
Projecs Consulting

Main Duties and Responsibilities:
• Define Project Scope and Create a Work Breakdown Structure (WBS).
• Identify construction activities, logic relationships, and predecessor/successor logic.
• Prepare project CPM schedules, reports, narrative, and time scale diagram using Primavera P3 and P6.
• Prepare and continuously update as built schedule using Primavera P6 including maintaining record of actual resources employed.
• Prepare project status and monthly status reports.
Sep 10 – Jun 13 Scheduler – Full Time
Proctal UK Ltd.

Main Duties and Responsibilities:
• Review construction plans and specifications.
• Perform construction crew determination and analysis.
• Establishes time schedule baseline using Primavera P6 and Performance Measurement Baseline (PMB).
• Prepare and manage project/task budgets.
• Perform "what if" analysis and risk analysis using Acumen Fuse Software and primavera risk management software.
• Maintain and update project schedules using Primavera P3 and P6.
• Analyse critical path and constraints to determine effect of changes to schedule and recommend work-around.
• Prepare project status and monthly status reports.
• Perform earned value management and resource levelling for the periodic updates.
• Prepare resource histogram of project staff, manpower and equipment.
• Prepare narrative and the contractual allegation for delay event.
• Perform impacted as planned analysis to assist the entitlement for extension of time.
• Assist the cost impact of the extension of time.
• Analyse the time schedules using Primavera Claim Digger and Acumen Fuse.
• Prepare counter claim document.

May 11 – May 13 Training Instructor - Freelancing Consultant
Collaboration, Management & Control Solutions (CMCS)

Main Duties and Responsibilities:
o implementation of new Primavera 6 Release 8 web to the client system
o Instructor for Project Management and Primavera courses

Sep 10 – Apr 11 Engineering Teacher Assistant – Part Time
Academy For Science And Technology,

DETAILED PROJECTS EXPERIENCE

PROJECS CONSULTING.
JUN 13 – CURRENT

I275 Interstate Highway Development ($450 million)

Position: Scheduler

Responsibilities: - Define Project Scope and Create a Work Breakdown Structure (WBS).
- Identify construction activities, logic relationships, and predecessor/successor logic.
- Establishes schedule baseline using Primavera P6 and Performance Measurement Baseline (PMB).
- Breakdown of project activities to measure the actual production rates.
- Develop resource/ cost loaded time schedule

I-4 Ultimate Florida Highway ($2.3 billion)

Position: Scheduler

Responsibilities: - Evaluate project schedule progress and performance.
- Analyse critical path and constraints to determine effect of changes to schedule and recommend work-around.
- Develop and update weekly look ahead schedules using Primavera P6 working with superintendents and field engineers.
- Assist project team to develop and maintain periodic status reports.
- Perform time impact analysis to assist and maintain delay events.
- Perform earned value management and resource levelling for the periodic updates.

PROCTAL UK LTD.
SEP 10 – JUN 13 (3 YEARS)


New Doha International Airport ($13 billion) 7 months

Position: Scheduler

Project Description: I have the position of Scheduling engineer and appointed to main contractor in new Doha airport construction to perform the scheduling tasks required by the main Consultant Bechtel International.

Responsibilities: - Review construction plans and specifications.
- Perform construction crew determination and analysis.
- Perform productivity analysis.
- Identify construction activities, logic relationships, and predecessor/successor logic.
- Prepare project CPM schedules, reports, narrative, and time scale diagram using Primavera P3.
- Review and analyse project schedules.
- Maintain and update project schedules using Primavera P3.
- Perform "what if" analysis and risk analysis using Acumen Fuse Software and primavera risk management software.
- Perform time-impact analysis.
- Supervise the work of junior level schedulers.
- Prepare project status and monthly status reports.
- Prepare and manage project/task budgets.
- Perform earned value management and resource levelling for the periodic updates.

Japan University of Science and Technology ($220 million) 2 months

Position: Cost Estimator

Project Description: I have the position of cost Estimator and appo...

Login or Register to view the full resume.