Industrial Engineer

2/14/2015
LAS PIEDRAS, PR

Position Desired

Industrial Engineering
Anywhere in the U.S.
Yes

Resume

Objective:
Seeking an engineering Full-Time position, in which I can demonstrate and expand my knowledge, skills and abilities that will eventually help me enrich my career and personal life.
Experiences: Jul. 2012- Present AutoGrupo- Nissan, San Juan P.R.
Master Kaizen- Dealer Standards Improvement Certification (DSI)
This job and project involves the following:
• Perform the analysis of the processes through Industrial Engineering tools in order to increase the productivity of work areas and contribute to customer satisfaction. Also, develop operational processes for various areas, in order to maintain the technical, human and financial company elements under a continuous improvement system to optimize profits and quality customer service.
• Designing internal audits for the quality system in order to verify the operation and implement improvement actions.
• Design or re-design procedures for the various areas of the dealership, in order to implement processes to optimize their operation and comply with the guidelines as well as the health and safety regulations in the work areas.
• Working under the ISO norm.

Nov. 2011- May 10, 2012 Capstone Project at AKM MFG., INC, San Juan PR
Industrial Engineer Student – Warehouse Design
This warehouse project design impact and improve the following:
• Product process flow.
• Space optimization.
• Fast response of raw material for manufacturing purposes.
• Control of inventory.
• Control of quality by means of receiving & incoming inspections.
• Evaluate, develops and improves manufacturing methods for quality control standards by the use of Lean, Six Sigma and/or Lean Six Sigma Methods that result in lower cost to the company.
Aug. 2011– Dec. 2011 Circulation Area at University of Turabo Library Gurabo, P.R.
Work Systems Design Engineering Project
This project involves the following:
• Improve ergonomically the Circulation area of the University of Turabo Library. To analyze the problem the engineering standards as RULA, Noise and Illumination were useful.
• Upon completion of the project will organize the work area so that was safe for the employee, in compliance with OSHA regulations. Was oriented to the employees of the correct postures. Using existing resources not sloped or expenses to implement the new changes.
Jan.2011- May.2011 Arroyo Distribution Group Las Piedras, P.R.
Work Measurement Engineering Project
This project involves the following:
• Calculation of work sampling to small companies.
• The company is having lost approximately $1000 per day due to delays in processing orders.
• The study results showed that there was a great loss of time in activities that were not added value.
• The recommendations given are that adopting the method of 5’s to reorganize the area and tools. Also use the method of Just in Time to avoid excess inventory and process having the quantity demanded and have the necessary equipment just for the week.

Aug 2010- Dec. 2010 Puerto Rico Energy Center at University of Turabo Gurabo, P.R.
Industrial Safety and Health Management Project – Create an Safety Manual
• Provide engineering support to the Safety Manual that is a key element in the pursuit of safety in an industry.
• The project requires the student to review both OSHA and PR OSHA regulations in order to write a compliant manual that gives guidelines that prevent accidents and lesions for workers.


Jan. 2008- May. 2008 Municipality of Mayagüéz at M...

Login or Register to view the full resume.