V

6/19/2015
Urbana, IL

Position Desired

Civil Engineering
Anywhere in the U.S.
Yes

Resume

Education And Academic Achievements

UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN, IL, USA AUG 2014 - MAY 2015
• M.Sc. Civil Engineering - Construction Management, GPA 3.96/4.00

NANYANG TECHNOLOGICAL UNIVERSITY, SINGAPORE SEP 2010 - MAY 2014
B.ENG. (CIVIL ENGINEERING)

CALCUTTA INTERNATIONAL SCHOOL, KOLKATA, INDIA AUG 2006 - MAY 2010
• High School, Received ‘Valedictorian - Best All Rounder Student’ in cohort

Work Experience

HYUNDAI ENGINEERING & CONSTRUCTION, INTERN, SINGAPORE JAN - JUN 2013
• Assisted the site engineer on the development of a proposed Shopping Mall, Hotel and Commercial offices on Orchard Road
• Managed labor work & attendance, daily work progress, and noted weekly meeting minutes
• Worked continuously on the construction of the Façade and Staircase Lobby, along with various other masonry and finishing works, including separation walls, Riser finishing and Door installations also
exacted and learned method statements supplied by subcontractors

AHLUWALIA CONTRACTS, INTERN, KOLKATA, INDIA JUL 2012
• Assisted the chief engineer on the commercial and hotel construction site, learning about foundations, piles, safety procedures and more
• Managed the construction of a pile cap from its commencement to its completion, overseeing its cal- culations, material requirements and its final establishment
• Worked on the fiscal division of project, calculating costing of and reporting the materials and labor requirements following the concerned governing laws

ESPACE - ARCHITECTURAL FIRM, INTERN, KOLKATA, INDIA JUL 2010
• Assisted the chief engineer on the development of a residential phase at a major construction site
• Managed labor work, attendance and other issues with labor and union head
• Liaised between labor contractor and chief engineer on demand and supply issues

Relevant Coursework/Projects

VISUAL SENSING PROJECT, UIUC, URBANA, IL, USA JAN - MAY 2015
• Worked in conjunction with web-based platform for carrying out construction productivity analysis
• Collected and setup platform database for drywall installation productivity calculations

FINAL YEAR PROJECT, NTU, SINGAPORE AUG - MAY 2013 - 2014
• Conducted research on existing fragility curve development and seismic vulnerability studies for exist- ing and future buildings
• Compared new vulnerability development method to existing ones, to evaluate its efficiency and sug- gest improvements

INTEGRATED DESIGN, NTU, SINGAPORE AUG - NOV 2013
• Developed a construction plan for an outdoor auditorium in a team of 9 members
• Managed construction management team; was in-charge of the procedures and process to be used
in the construction and of managing the finances of the entire project

ENGINEERING INNOVATION AND DESIGN, NTU, SINGAPORE JAN - MAY 2012
• Participated in a team of 7 to develop a self-sufficient zero energy house capable of generating a sur- p...

Login or Register to view the full resume.